Gordon Composites

This project was design-build, including design and construction of Gordon’s process equipment featuring compressed air, a water filtration system, a large tank, and a vacuum system for plastic supply. This facility features a 10,000 sf mezzanine office with windows that look out to the manufacturing floor and includes a covered executive parking area.

LOCATION

Highfield Business Park, Lot 2
Douglas County, Colorado

DESCRIPTION

Construction of an approximately 115,285 Sf footprint light manufacturing facility.

CONSTRUCTION MANAGER

Central Development

ARCHITECTURE FIRM

intergroup Architects