Weatherford Artificial Lift Systems

New Build
,
Tenant Finish
,
Office
,
Industrial
,
Empty

After the original general contractor filed for bankruptcy, Alcorn stepped in to deliver a successful outcome. This situation required us to work very closely with Weatherford to assess and document the existing conditions before construction started. Relationships with the existing subcontractors were maintained, where possible, to limit costs and liability for Weatherford, and to be fair to the subs left exposed by the bankruptcy.

I-25 Business Park 4080 Camelot Cir. Longmont, CO 80504
Size:
Client:
Weatherford
Architect:
ArchIteriors
Construction Manager:
Developer:
Broker:
Building Owner:

Similar PROJECTS

View All